Write a scope the site team can check
Identify workers and shifts, the anticipated use period and whether subcontractors arrive together or in separate phases. State which existing facilities are permitted for their use. Have the responsible site team confirm workplace requirements; hiring toilets alone does not establish the project’s compliance.
Separate the equipment requested from the services needed to keep it usable. Basic cabins, accessible provision and washing each answer different needs. Specify the actual features required instead of assuming a construction package includes every item.
Name the people controlling access
Give the provider the delivery entrance and a contact able to admit its vehicle. If check-in, an escort or a restricted area is involved, discuss that before scheduling. Review unloading space and pedestrian routes with the person responsible for the site layout.
A fence line or materials stack may move during the job. Include a process for telling the supplier about changes before they prevent service. Relocation should be agreed with the provider rather than left to whoever happens to have site equipment available.
Revisit the order when the job changes
Use major workforce and layout changes as review points for quantity, washing and service frequency. Ask how additional visits, equipment changes or extensions are requested and confirmed. The original schedule should not silently become the plan for a larger phase.
Close the order when the last people needing facilities have finished. Keep removal access open after other equipment arrives to clear the site, and confirm who can authorize collection. These details belong in the working order, not only in an initial conversation.
Questions before you book
Should the largest planned crew be mentioned?
Yes, alongside the timing of that phase and the normal shifts. A total headcount alone does not describe how facilities will be used.
Can the units move as construction advances?
Ask the supplier about the new location and relocation arrangement before moving them.